Section 9.2 New Project

Section 9.2 New Project


Section 9.2   New Project

Prior to setting up a project you will need to set up the attributes. Please refer to the following section of the Manual: Configuration Management, Attributes.

    • Related Articles

    • Section 9 Project Management

      Project Management A Project holds the overall design of the system. This area allows the Workspace Administrator to manage Projects and their parts (entities). A Project has the following entities: collections, attributes, automation, and workflow. ...
    • Section 9.2.6 New Collection

      Section 9.2.6 Collections (Owned by Project Name) It is suggested you create a Taxonomy before creating a Collection for a Project. Collections require a taxonomy before they are available for production. Please Refer to Configuration Management, ...
    • Section 9.3 Project Catalog

      Section 9.3 Catalog The catalog lists all the projects in your workspace along with all valuable information about the project. Below you will find a list of project metadata provided in the catalog. You can Create, Edit/Update and Delete a project ...
    • Section 9.1 Project Management Overview

      Section 9.1 Project Management Overview The overview simply informs the user about the specific area of the website. The overview also has a link to a wizard and quick links to other entities that need to be configured before creating a Project.
    • Section 9.5 Project Detail/Edit

      Section 9.5 Project Detail/Edit Selecting a Project from the catalog or from My Projects in the navigation page will take you to the Project Detail/Edit page where the collection(s) assigned to the Project are listed in a grid. Section 9.5.1 ...